CHINA PAKISTAN GOLF ESTATE, GAWADAR

Picture of Khalid Zafar Siddiqui
Khalid Zafar Siddiqui

CEO Six Sigma Consult

PROJECT

CLIENT

LOCATION

AREA

SCOPE OF SERVICES

  

 


COST (IN MILLIONS PKR)

DURATION

CHINA PAKISTAN GOLF ESTATE, GAWADAR

Empire Properties Pvt. Ltd.

Gwadar

155 Acres

The Detail Planning & Infrastructure Design of

        ✯ Road works             ✯ Water Supply System

        ✯ Sewerage System    ✯ Storm Drainage System

        ✯ Irrigation Network   Electrical & Street Lighting

1000

November 2018 to June 2019 (Design Completed).

Construction (30% Completed)

DETAILS

The site is allocated to a primary arterial road near the airport at Gwadar. Infrastructure development has been given high priority by the authority since the artery is the main link to CPEC development.

 

Our client is focused and determined on designing through a professional team. Six Sigma Consult performed the design and provided top supervision during the execution phase.

RELATED PROJECTS