THE CITY SCHOOL
AT PAF NEW MALIR

Picture of Khalid Zafar Siddiqui
Khalid Zafar Siddiqui

Founder/ Chief Executive Officer

PROJECT

CLIENT 

LOCATION

AREA

COVERED AREA (Approx)

SCOPE OF SERVICES

 

 

COST (IN MILLIONS PKR)

DURATION

THE CITY SCHOOL AT PAF NEW MALIR

THE CITY SCHOOL

JINNAH AVENUE, KARACHI

Ground +3 Floor

100,000 SFT.

Structural design Electrical, HVAC Public address system

Smoke detection, Plumbing External infrastructure

Boundary walls, Underground Reservoir, Top Supervision

500 Million (approx.)

Jan 2021 – Aug 2021 (Design completed)

Oct 2021 – to date (Construction 60%)

DETAILS

The immaculate façade design was created by M/s Habib Fida Ali with all facilities incorporated.  The G+3 building structure comprised approx. 100,000 sft. Equipped with technological solution of electrical and safety. Extra safety concerns adapted for children and their facilities.

 

Detailed Building design from inception till complete construction with top supervision is under scope of Six Sigma Consult.

RELATED PROJECTS